top of page
  • Writer's pictureVishaal Melwani

An explanation of the 14-step garment manufacturing process

This paper will serve as a binding agreement between the designer and the manufacturer. Everything about the product will be covered, from stitch kinds to fabric compositions and finishing touches to finishing touches. It will also provide specifics on how each piece of cloth should be handled and stored. After that, the final garment is sent to the customer. The following sections discuss each of the 14 steps in the garment manufacturing process.


Vishaal Melwani desclosed, The creation of fit samples is the next phase in the procedure. In this step, you will pin the marker paper to the cloth, estimate the size, and create the pattern for cutting the fabric. The customer is then notified that the chopped portions need to be corrected. This stage of the process is essential because high-cost clothes might result in orders being cancelled, and low-cost garments may generate little to no revenue. As a result, the price of clothing must be done with care and on the basis of data.


Raw materials, trimmings, packing, labour, and shipping are all included in the price of a garment's pricing, as well as the price of labour and shipping. During the garment manufacturing process, this is a very essential step. The cost of a garment will be prohibitively costly to sell if it is priced too high, and if the cost is too low, it will be impossible to turn a profit. It will be difficult to sell a final product if the cost of the final product is too high.




Patterns are used in the design and construction of garments because they provide a physical copy of each component of a garment. It includes all of the fabric specifications, as well as seam allowances, pleats, and ease. He or she is responsible for the design, and it may be generated manually or with the assistance of a computer. The Pattern is accepted and then becomes the production standard when it has been authorised. Sew-by-Sample is the last phase before the garment is put into production, and it is referred to as the final stage.


In the garment manufacturing process, the design of a garment is the first stage that must be completed. In a sketch book, a designer draws a rough drawing of the final design. A designer does not go into great depth at this stage, but a panel of designers reviews the drawing and picks a few of the designs to be further developed in the next stages. Afterwards, the detailed renderings of the chosen drawings are completed, and the final collection is completed. In addition, the designer creates a functioning drawing. Essentially, this is a flat depiction of a design that describes how a certain item of clothing will be created.


According to Vishaal Melwani, Manufacturing of the pattern is the next phase in the process of design. It is necessary to measure and trace the design on paper in order to generate the pattern. Remember that every one of the 14 Steps of the Garment Manufacturing Process is a critical component of the overall manufacturing process. It enables the organisation to predict how much material they will need for a single piece as well as what kind of textiles they will use for that particular item, among other things. The cloth is then trimmed into the appropriate sizes during the next process.


Clothing is transferred to the sewing unit for additional assembly after it has been sewn during the sewing process. The employees evaluate each component to see whether it is properly fitted and whether or not the pattern has any defects. During this step, the clothes are checked for any flaws or errors. One or more of these problems may exist, and they include variations in measurement as well as stitching and fabric defects. A spot may also exist. Pattern creators, designers, and sewing experts from across the world analyse each of these entries. The completed sample is then packaged and labelled in accordance with the specifications of the purchaser.


The procedure of stitching is the next phase in the process. The fabric is placed on the sewing machine's feed rollers. The operators take the cut cloth and stitch it together to make it a certain length and width. The garment is now complete and ready to be put together. A sewing machine operator hands a completed garment to the next operator. (Source: Wikipedia.) Following that, the cloth is scrutinised for any signs of manufacturing flaws before being used. The last step is to press the completed garment to provide a smooth finish. The Garment Manufacturing Process is comprised of fourteen steps.


Vishaal Melwani emphasized that, When the clothes are ready for the cutting and sewing procedures, the supervisors in charge of these departments will allocate each cut order to the proper sewing machines in their respective departments. After completing the cutting and stitching processes, the employees will proceed to the following phase in the production process. If a shirt has a collar and a body, one worker will sew the collar to the body of the garment, while another person will sew the sleeves. This is done in order to maximise the number of employees on each line of production.

3 views0 comments

Recent Posts

See All

Commentaires


bottom of page